Highway S7 Napierki-Nidzica - WWW-PONT-2017

Go to content

Main menu:

Selected projects
Highway S7 Napierki-Nidzica
S7 Napierki - Nidzica
Description of project:
1. Background of the road
Start of construction of a road S7 km located at km 203 + 500 existing road No. 7, the end of the road construction S7 in km 225 + 100 existing national road No. 7.
- Length: 20.7 km

2. Basic technical parameters
- Technical Class - S
- Cross-section - 2/2
- Design Speed - Vp = 100km / h
- The width of the road - 2 x 7,00m
- The width of the lane -3.50 m
- The width of the emergency stop - 2,50m
- Load target road construction - 115 kN / axle
3. The scope of investments
The investment project is the construction of the expressway No. S7 section Nidzica-Napierki (border Mazowieckie and Warmia and Mazury), the construction of service roads serving the area immediately adjacent to the road and 4 junctions.
The project will be implemented broken down into two sections:
- Bypass Nidzicy (junction North Nidzica - junction Nidzica South) - 9.1 km
- Nidzica South - Napierki - 13.6 km
4. engineering objects
- 15 road viaduct,
- 1 local viaduct
- 2 bridges,
- 1 large ecological transition for animals
5. 4 road junctions - "Nidzica North", "South Nidzica", "Powierż", "Napierki"
6. Mops - type I near the town Pawliki (on both sides of the road)
7. Protection of the environment
- Animal crossings necessary for safe migration of animals,
- Equipment poignant rainwater flowing from the roadway,,
- Acoustic screens


 
 
Back to content | Back to main menu