1. Background of the road
The beginning of the construction of a bypass road within Radom S7 km located in an existing 456 + 670 km proj. 0 + 000,00 current national road No. 7, the end of the road construction proj S7 in km. 24 + 700 National Road No. 7.
- Length: 24.7 km
 
2. Basic technical parameters
- Technical Class - S
- Cross-section - 2/2
- Design Speed - Vp = 100km / h
- The width of the road - 2 x 7,00m
- The width of the lane -3.50 m
- The width of the emergency stop - 2,50m
- Load target road construction - 115 kN / axle
 
3. The range of investments
The investment project is the construction of the bypass Radom in the S7 express road, construction of service roads serving the area immediately adjacent to the road and 4 junctions.
The project will be implemented broken down into two stages:
- Phase I from km 0 + 000.00 to km 22 + 22.35 km 350,00-
- Phase II from km 22 + 350.00 to km 24 + 2.35 km 700,00-
4. Structures
- 24 viaducts Road,,
- 3 bridges,
- 2 footbridges
5. 4 road junctions - "Radom North", "Radom West", "Wolanów", "Radom South"
6. mops
- Type II to Krakow - km proj. 11 + 400, km 468 + 070 S7
- Type III towards Warsaw - km proj. 11 + 200, km 467 + 870 S7
Protecting the environment
- Animal crossings necessary for safe migration of animals,
- Equipment poignant rainwater flowing from the roadway,
- Acoustic screens

 
 